The California Maritime Academy State
Funded Capital Outlay Program
Projects in Budget Year
Physical Education/Pool
Replacement Facilities PWC $14,230,000
This project will replace the existing
physical education building and
natatorium (#14) that were constructed
in 1944 and 1947, respectively, with a
26,000 ASF/35,000 GSF Physical Education
Facility and an outdoor pool (#39). The
existing gymnasium and natatorium are
inadequate for physical education
classes and the water activities
required for licensure by the U.S. Coast
Guard. The growth FTE in physical
education registers as “other” in the
Academic Planning database; therefore,
there is no lecture/lab capacity
identified. This project is master
planned on land currently being sought
for acquisition by the campus.
Proceeding with this project is
contingent upon the acquisition. The
future cost of equipment is $192,000.
Future Projects (2006/07–2009/10)
Simulation Center (Equipment)
This project will equip the new 15,000
ASF/24,500 GSF facility, consolidating
the location of eight simulators with
their related debriefing facilities for
the marine transportation curriculum.
The addition will provide for 21 faculty
offices, 84 FTE in lecture space, 25 FTE
in LD laboratory space, and 15 FTE in UD
laboratory space for a total of 124 FTE.
Marine Programs Building
This project will construct a 12,000 GSF
two-story building (#49) to house the
general programmatic needs for naval
science and maritime operations. It will
provide administrative space and
accommodate 60 FTE in UD laboratory
space.
Physical Education/Natatorium
Renovation
This project will renovate the existing
20,000 GSF building to convert the
facility from physical education to
instructional support. It will house
various student service units: the
community service learning program, the
career planning and placement center,
the counseling center for students, the
Cal Maritime Center for Excellence and
Learning, the disability resource
office, and the library archives. The
renovation of the 1947 building will
preserve the architectural character of
the building while enhancing its
function and initiating the
consolidation of student services.
Administration/Student Services
Replacement Building
This project will build a 10,600 GSF
facility to replace the existing
administration building (#1) built in
1957, and the conference room addition
built in 1976. With the increase in
student population and the expansion of
the academic program, additional space
for student services and administrative
functions is necessary. Currently
admissions are in a modular, and records
are housed in the faculty office
building. The project will consolidate
these functions to provide more
efficient services.
The California Maritime Academy
Non-State Funded Capital Outlay Program
Projects in Budget Year
None
Future Projects (2006/07–2009/10)
Student Center
This project will build a 4,000 ASF
addition (#40) west of the current
Student Center (#15) to meet the
recreational activity and food service
needs for the students. Funding will be
from student union reserves and a future
bond sale supported by student union
fees. Proceeding with this project is
dependent upon a viable financial plan
and qualification for placement in the
systemwide revenue bond program.
|