|
Vessel Operations
DATE: May 14, 2006
|
Voyage
Summary |
|
|
Total
Distance - Zihuatanejo to Balboa Panama |
1,547.6 nm |
|
Projected
Time |
4d 05h
49m |
|
1200 Nav
Report -
From
Departure |
|
|
Length Of
Day |
24 hr. |
|
Time Zone
Observed |
+ 5 (5
hours behind GMT) |
|
Distance
Traveled |
1277.8
nm |
|
Average
Speed |
13.8 kts. |
|
Total
Distance Traveled |
1277.8 nm |
|
Total
Voyage Time |
3d 8h
00m |
|
Average
Speed For The Voyage |
16.8 kts. |
|
Distance
To Go |
270
nm |
|
Speed
Required For ETA |
12.8 kts. |
|
1200
Engineering Report
- From Departure |
|
|
Average RPM |
|
|
Prop.
Miles |
|
|
Obs. Miles |
|
|
Slip |
|
|
Fuel Aboard |
|
|
BBLS Fuel/Mile |
|
|
FW Aboard |
|
|
FW Distilled |
|
|
Distilled Water Aboard |
|
|
Water Cons |
|
|
|
|