|
Vessel Operations
DATE: May 27, 2006

Cadets Hunt and
Okazaki performing daily tests on the ship's radio and
satellite equipment. The tests confirm that the equipment is
operating properly and ready for use incase it is needed for
emergency communications.
|
Voyage
Summary |
|
|
Total
Distance - Callao, Peru to Valparaiso, Chile |
1,447 nm |
|
Projected
Time |
5d 21h
53m |
|
1200 Nav
Report -
From
Previous Noon |
|
|
Length Of
Day |
24 hr. |
|
Time Zone
Observed |
+ 4 |
|
Distance
Traveled |
243 nm |
|
Average
Speed |
9.8 kts. |
|
Total
Distance Traveled |
1019
nm |
|
Total
Voyage Time |
4d
0h 18 min. |
|
Average
Speed For The Voyage |
10.4 kts. |
|
Distance
To Go |
415.3 nm |
|
Speed
Required For ETA |
9.6 kts. |
|
1200
Engineering Report
- From Previous Noon |
|
|
Average RPM |
63.22
rpm |
|
Prop.
Miles |
260.93 nm |
|
Obs. Miles |
246.0
nm |
|
Slip |
5.72% |
|
Fuel Aboard |
882,004 gal |
|
BBLS Fuel/Mile |
.57
barrels |
|
Fresh Water Aboard |
32,071
gal |
|
Fresh
Water Distilled |
17,966
gal |
|
Distilled Water Aboard |
10,526
gal |
|
Water Consumed |
11,898
gal |
|