Itinerary Virtual Cruise Comments Past Cruise Archives Home

Vessel Operations

05/30/2007

Date 30 May 2007

Noon Report

Summary

 

Hong Kong to Da Nang

 

Projected Time:

 

Estimated Average Speed:

 

 

 

Sunrise

 

Sunset

 

Time zone

- 7

Latitude

 

Longitude

 

Water depth

 

Speed

11.5

Distance Run

255

Distance to go

288

Estimated time of arrival (eta)

0800 31 May

Average engine RPM

78.65

Propeller miles

277.3

Fuel aboard

2295 tons

Slip

8.0 %

Daily fuel consumption

21.6 tons

Fuel consumption/mile

0.64 BBL/nm

Water distilled

65 tons

Water aboard

102 tons

Water consumed

39 tons

*kts = knots

 

**nm = nautical mile

 

***bbL = barrel

 

 

 


 

 
 
Cruise  |  Captain's Log  |  Bear's Tale  |  Weather Info  |  Vessel Operations  |  Photo Album