Itinerary Virtual Cruise Comments Past Cruise Archives Home

Vessel Operations

06/09/2007

Date 9 June 2007

Noon Report

Summary

 

Da Nang to Apra, Guam

 

Projected Time:

 

Estimated Average Speed:

 

 

 

Sunrise

 

Sunset

 

Time zone

- 10

Latitude

14° 19.3' N

Longitude

141° 00.0' E

Water depth

 

Speed

10.5 kts

Distance Run

253.8

Distance to go

217.0

Estimated time of arrival (eta)

0840 June 10

Average engine RPM

70.22

Propeller miles

277.78

Fuel aboard

2086 tons

Slip

8.6 %

Daily fuel consumption

18.2 tons

Fuel consumption/mile

0.54 BBL/nm

Water distilled

42 tons

Water aboard

41 tons

Water consumed

48 tons

*kts = knots

 

**nm = nautical mile

 

***bbL = barrel

 

 

 


 

 
 
Cruise  |  Captain's Log  |  Bear's Tale  |  Weather Info  |  Vessel Operations  |  Photo Album